Cuerpo

In general —and through our professional practice—, we have observed countless errors when economically evaluating Companies and Projects, whether in the role of counterparty, as an investment project auditor, or as a simple observer. The errors that in our judgment are the most recurrent are synthetically stated below:
- Discounting cash flows using the WACC when dealing with Entrepreneurship projects (Start-Up).
- Projects and Ventures are calculated using a required return on assets (Ka). If the project has the same risk as the Company, the Company's Ka is used. Otherwise, a Ka from a company with similar risk to the one being evaluated must be used.
- Calculating the WACC using Book Debt and Equity (instead of market values).
- Estimating constant growth rates without incorporating the forecast risk into the supporting data that gives rise to that rate.
- When calculating the risk-free rate in the CAPM, not matching the maturity of the evaluation horizon with the long-term risk-free rate.
- Not incorporating the debt Beta when levering the equity beta.
- Not considering country risk or size risk in determining the discount rate.
- Not considering the need for NOF (Operating Fund Requirements) in determining expected cash flows.
- Assuming that the perpetuity begins in period n, when in fact it begins in n+1.
- Not considering the theoretical limitations in determining the perpetuity growth rate.
- Mixing real expected rates and cash flows with nominal expected rates and cash flows.
- Considering cash in a valuation as a cash flow to the shareholder, when there is conviction that it will not be distributed.
- Assuming that the calculation method used to determine the value does not matter, the result will be identical (without reconciling assumptions among FCFF, FCFE, FCFC, and APV).
Do not hesitate: if you need a third opinion or definitively a rigorous determination of a value, call us and be sure.